Pre-boot preparations,
1. Check the buttons, operation handles, electrical circuits, such as damage or failure, whether the switch handle is in the position. 2. The safety door is the guide rail on the move is flexible, can trigger the formation of a switch. 3. The length of the screw of the mechanical safety device is adjusted to the proper position, which can really play a protective role. Four. Check whether there are any sundries or metal parts in the feeding mouth of the barrel 5, connect the cooling water 6. Add proper amount of Lube Oil to each Lube Point on the slide block surface 7. Wipe the mold cavity with soft cloth or cotton rust inhibitor, blow clean the skeleton air. 8. The raw material is preheated and dried in the drying barrel
plastic injection machine
2024 04/27
