For emergency shutdown, press the host stop button and stop the pump motor
1. Close the hopper gate, production finished hopper remaining material
2. At the end of the last cycle, turn the function selector switch to the manual position 3. Press the seat back button to manually back out.
4. Open the safety door, clean the mold cavity debris, rust inhibitor, manual closing, close the cooling water, stop the cooling wind
5. Place all buttons in the off position (i. e. reset)
6. Turn off motor, pad, main power switch
7. Clean up machine wipe clean, clean the floor, the items put back into place